Our big project is officially over but there's always something to do on an older house, or any house for that matter! So this week we painted the walls in our piano/art studio room (the room through which you enter our house from the front door) and then had a new floor installed by carpenter Justin Souza. The old carpet was torn out, then the floor was leveled to fix a 2.5 inch slope from the front of the room to the back. The same pre-finished hardwood oak flooring that we put in addition/renovation rooms was installed here. The floor was completed in only 2 days from start to finish!